The 2-2-3 schedule: one rhythm, three names
“2-2-3” describes a rhythm, not a single roster: work two days, take two off, work three, take two off, work two, take three off. Four crews on 12-hour shifts share it so a site is covered 24 hours a day, 7 days a week. What changes from one employer to the next is who works days, who works nights, and whether crews swap between them.
Pitman, Panama and 2-3-2 in one line each
- Pitman is the fixed version. Two crews stay on days, two stay on nights, and the cycle is 14 days long.
- Panama is the same rhythm but crews spend two weeks on days and then two weeks on nights, so the full cycle is 28 days.
- 2-3-2 is the same 14 days counted by work blocks instead of rest blocks. Most people mean the same thing by it, but check your roster.
The weekly hours are identical, 42 on average, and so are the days worked: about 183 shifts and 2,190 hours a year. The difference is in the nights. A Pitman night crew works about 183 night shifts a year. A Panama crew works about 91 nights a year, because it spends half the year on each shift type.
| M 1 | T 2 | W 3 | T 4 | F 5 | S 6 | S 7 | M 8 | T 9 | W 10 | T 11 | F 12 | S 13 | S 14 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Crew A | D | D | D | D | D | D | D | |||||||
| Crew B | D | D | D | D | D | D | D | |||||||
| Crew C | N | N | N | N | N | N | N | |||||||
| Crew D | N | N | N | N | N | N | N |
Where the 2-2-3 comes from
Twelve-hour rotations spread through continuous-process industry, hospitals and public safety over the last several decades because four crews on 12 hours are easier to staff than five or six crews on eight. The 2-2-3 became popular inside that group because it keeps the longest work stretch to three days and gives every second weekend as a three-day break when the cycle is aligned. The name does not have a single inventor or a single definition, which is why employers use it loosely.
How to tell which version you work
- Look at one crew over six weeks. If it only ever works the same hours of the day, it is Pitman. If it moves from days to nights after two weeks, it is Panama.
- Count the days off between the last day shift and the first night shift. Panama gives three, so the switch is gentle.
- Check the crew letters. Four crews, A to D, with A and B (or C and D) offset by exactly seven days is the standard layout for both.
2-2-3 and weekends: the start date matters
The 14-day cycle meets the seven-day week twice. When day 1 is a Monday, each crew works Monday, Tuesday and then Friday, Saturday, Sunday in the first week, and only Wednesday and Thursday in the second. That is the arrangement that gives every other weekend off. Move the start to a Wednesday and every weekend contains a work day. The Pitman page has the full table for all seven starting weekdays.
Overtime on a 2-2-3
A crew works 84 hours in 14 days, so the average week is 42 hours, but the single weeks are never 42. They are 36 and 48 in the best alignment and 24 and 60 in the worst. Where the employer starts the workweek therefore moves the overtime total a lot. It is worth asking before you sign up for a 12-hour posting. A week away costs about 2 to 4 shifts of leave on a 2-2-3, which is one of its quiet advantages.
Is the 2-2-3 right for you?
It suits people who want the rhythm of short stretches and frequent days off, and who can live with working weekends in the weeks that fall that way. It suits less well anyone who needs the same days off every week, or who wants to avoid 12-hour days entirely. For that, compare the 8-hour continental or the 9/80.
Numbers on this page are calculated from the standard Pitman cycle and rounded. Your employer's posted roster is the official schedule. Last reviewed November 2026.