On a Monday-to-Friday job, a week away costs five days of leave. On a rotating schedule it costs only the shifts that fall inside the dates you are away, and that can be a lot fewer. The table counts the shifts a crew would have to cover with leave for a break of 7, 10, 14 or 21 days. Each cell shows the best case, if you choose the cheapest window in the cycle, and the average, if you pick dates at random.
| Pattern | 7 days away | 10 days away | 14 days away | 21 days away |
|---|---|---|---|---|
| Pitman | 2 to 3.5 | 4 to 5.0 | 7 to 7.0 | 9 to 10.5 |
| Panama | 2 to 3.5 | 4 to 5.0 | 7 to 7.0 | 9 to 10.5 |
| DuPont | 0 to 3.5 | 3 to 5.0 | 4 to 7.0 | 8 to 10.5 |
| 4 on 4 off | 3 to 3.5 | 4 to 5.0 | 6 to 7.0 | 9 to 10.5 |
| 24/48 | 2 to 2.3 | 3 to 3.3 | 4 to 4.7 | 7 to 7.0 |
| 48/96 | 2 to 2.3 | 2 to 3.3 | 4 to 4.7 | 6 to 7.0 |
| Kelly | 2 to 2.3 | 3 to 3.3 | 4 to 4.7 | 6 to 7.0 |
| Continental | 5 to 5.3 | 6 to 7.5 | 10 to 10.5 | 15 to 15.8 |
| 9/80 | 4 to 4.5 | 5 to 6.4 | 9 to 9.0 | 13 to 13.5 |
Figures are shifts of leave, so on a 24-hour pattern each one is a full 24-hour shift, and on a 9/80 each one is a 9-hour day.
What stands out
- DuPont has the cheapest week. If you pick the window around its 7-day break you need no leave at all for a 7-day trip.
- 24-hour patterns look cheap in shifts and expensive in hours: a 7-day trip may cost two or three shifts, but each is 24 hours of leave.
- Continental is the most expensive because you work six of every eight days, so even a good window costs five shifts of leave for a week.
- The 9/80 is cheap per hour because every other Friday is already off.
How to pick the cheapest window
- Open your pattern page and set your crew and start date.
- Move through the months and look for the longest run of Off days on the calendar.
- Choose a trip that starts the day before a long block of Off days, and ends the day after.
- Add extra days of leave only to fill the gap on one side.
- Download the .ics file so the dates show up in your phone calendar.
A note on hours versus days
Employers count leave in hours or days, and some count a 12-hour shift as 12 hours, others as one day. On a 24-hour pattern a single shift of leave may cost 24 hours or one day depending on policy. Ask how your leave is charged before you compare patterns.
Quick answers
How much leave do I need for a week off on a 12-hour schedule?
About 2 to 4 shifts on a Pitman or Panama, as few as 0 on the DuPont in the right window, and about 3 to 4 on a 4 on 4 off.
Which schedule needs the least leave?
The DuPont for a week, because of its 7-day break, and the 24-hour patterns in number of shifts.
Edited and reviewed by Adriano Mendes. Figures are calculated from the standard patterns on this site and rounded. This is general information, not legal, payroll or medical advice. Last updated November 2026.