A full weekend off means both Saturday and Sunday are free. We counted them for every pattern in a repeating block that is a whole number of weeks, and for each of the seven weekdays that day 1 of the cycle can fall on. The figures below are per year, averaged over every crew on the pattern.
| Pattern | Cycle | Full weekends off per year | Share of weekends | Most weekends worked in a row |
|---|---|---|---|---|
| Pitman | 14 days | 0 to 26 | 0% to 50% | 2 |
| Panama | 28 days | 0 to 26 | 0% to 50% | 4 |
| DuPont | 28 days | 0 to 26 | 0% to 50% | 4 |
| 4 on 4 off | 16 days | 20 | 38% | 5 |
| 24/48 | 3 days | 17 | 33% | 2 |
| 48/96 | 6 days | 26 | 50% | 3 |
| Kelly | 9 days | 17 | 33% | 3 |
| Continental | 8 days | 7 | 13% | 7 |
| 9/80 | 14 days | 0 to 52 | 0% to 100% | 2 |
What the table says
- Patterns with a fixed share give the same count whatever the start date. The 48/96 gives half of all weekends, the 4 on 4 off about 38 percent, the 24/48 and Kelly a third, and the continental about one in eight.
- Patterns built on whole weeks can give anything from none to every other weekend. This is true of the 14-day Pitman, the 28-day Panama and DuPont, and the 14-day 9/80. For them the weekday of day 1 matters more than the pattern.
- The 9/80 gives every weekend off when day 1 is a Monday, and breaks across the weekend in other alignments.
Why the start weekday matters
A cycle whose length is a multiple of seven days lines up with the calendar week the same way every cycle. The work blocks land on the same weekdays, so the weekend is either hit by a work block or it is not. A cycle that is not a multiple of seven, such as the 16-day 4 on 4 off or the 3-day 24/48, moves against the week, so weekends are shared out evenly. The calendar tool counts the weekends for your own start date in the card labelled Full weekends off, next 8 weeks.
Why a long run matters as much as the average
Two schedules can give the same number of weekends off a year and feel very different. The 48/96 gives half of all weekends and never makes you work more than three in a row. The 4 on 4 off averages fewer, but the worst stretch is five weekends in a row. The last column is worth checking if weekends matter to your family.
How to check your own schedule
- Open the page for your pattern and set your crew and start date.
- Look at the card Full weekends off, next 8 weeks.
- If the count is zero on a 14-day or 28-day pattern, compare your start weekday with the table on that pattern's page.
Pattern pages with the full alignment tables: Pitman, Panama, DuPont and 9/80.
Quick answers
Which shift schedule gives the most weekends off?
The 9/80 gives every weekend off when it starts on a Monday. Among rotating patterns the 48/96, and the Pitman, Panama and DuPont in their best alignment, give half of all weekends.
Which gives the fewest weekends off?
The 8-hour continental schedule, about one weekend in eight, because you work six of every eight days.
Does the start date change the weekends I get?
On 14-day and 28-day patterns, yes, a lot. On the 4 on 4 off, 24/48, 48/96, Kelly and continental it does not.
Edited and reviewed by Adriano Mendes. Figures are calculated from the standard patterns on this site and rounded. This is general information, not legal, payroll or medical advice. Last updated November 2026.