How to turn your posted roster into a custom rotation
Many workplaces run a rotation that is not one of the named patterns: a local variation of the DuPont, a 7-on-7-off for a remote site, or a mix of days and nights that only your plant uses. The builder above handles all of these, as long as you can write one full cycle as a row of letters. This guide shows how to read that cycle off your posted roster, how to check it, and what the numbers for a few common custom rotations look like.
Step 1: find where your rotation repeats
Take your posted roster for at least two months and write one letter per day for your own line: D for a day shift, N for a night shift, T for a 24-hour shift and O for a day off. Then look for the point where the same run of letters starts again. That length is your cycle. Most rotations repeat every 2 to 6 weeks; the builder accepts up to 42 days.
A quick test: if you think the cycle is 14 days, the letter for any date should equal the letter 14 days later, and 28 days later. If even one pair differs, either the cycle is longer or the roster contains a swap or a holiday change. Use dates without swaps when you count.
Step 2: pick day 1 and the shift length
Day 1 can be any date where your row starts; what matters is that the letters follow on from it in order. Pick a recent date you are sure about, such as the first day of your last block of day shifts, and start your letters there. Then choose 8, 10 or 12 hours for the shift length. Night shifts are shown on the date they start, which is how most rosters print them, even though they end the next morning.
Step 3: check it against two dates you know
Before you rely on the calendar, check two dates you already know, ideally a few weeks apart, and one of them a weekend. If both match, the whole rotation is right, because a rotation is just the same row repeated. If one is off by a day, day 1 is usually one day early or late; move it and check again.
What common custom rotations add up to
These are rotations people often type into the builder. The figures are averages over a full cycle for one person. When the cycle is a whole number of weeks, as with the 14-day rotations here, weekends off depend on which weekday day 1 falls on, so they are shown as a range across all seven possible start days. When it is not, every weekday comes round in turn and the number is the same whatever the start day.
| Rotation | Letters | Shift | Cycle | Hours per week | Shifts per year | Longest on / off | Full weekends off per year |
|---|---|---|---|---|---|---|---|
| 3 on, 3 off | DDDOOO | 12 h | 6 days | 42.0 | 183 | 3 / 3 | 17 |
| 4 on, 3 off, 3 on, 4 off | DDDDOOODDDOOOO | 12 h | 14 days | 42.0 | 183 | 4 / 4 | 0 to 52 |
| 7 on, 7 off | DDDDDDDOOOOOOO | 12 h | 14 days | 42.0 | 183 | 7 / 7 | 0 to 26 |
| 5 days, 2 off, 5 nights, 2 off | DDDDDOONNNNNOO | 8 h | 14 days | 40.0 | 261 | 5 / 2 | 0 to 52 |
A few things stand out. The 3 on, 3 off rotation and the 4 on, 3 off, 3 on, 4 off rotation both average 42 hours a week, but the second one has a fixed 14-day shape, so once you know your start weekday your weekends off are the same every fortnight. The 7 on, 7 off rotation also averages 42 hours, yet it puts 7 shifts in a row, so it suits people who travel to a site and want long breaks at home, and it is hard on anyone who needs to be home every evening. The 5 days, 2 off, 5 nights, 2 off rotation on 8-hour shifts gives about 40 hours a week and 261 shifts a year, many more trips to work than any 12-hour rotation.
When the builder is not enough
- Several crews. The builder draws one line, yours. To see a whole team, use one of the named patterns, which show every crew, or build one rotation per person and share the links.
- Shifts of different lengths. Day and night shifts use the shift length you choose, and T is always 24 hours. A rotation that mixes, say, 8-hour and 12-hour days in the same cycle will show the right days but not the right hours.
- Swaps, overtime and leave. The calendar shows the rotation, not the changes your supervisor makes. Keep those on your own calendar after you export it.
Common mistakes
- Counting a night shift twice. A night that starts on Monday and ends on Tuesday morning is one letter, on Monday.
- Leaving out the off days. Every day of the cycle needs a letter, including each day off. A 7-on-7-off rotation has 14 letters, not 7.
- Using a roster with holiday changes. Count your cycle from ordinary weeks, then add holidays by hand.
If your rotation is a named one, the pattern pages give more detail, including every crew and how the start weekday changes weekends and overtime. You can also put up to three patterns side by side on the compare page.
Figures are calculated from the rotations shown and rounded. Your posted roster is the official schedule. Reviewed by Adriano Mendes, November 2026.