Rotating schedules come with their own vocabulary, and the same word can mean slightly different things at different employers. These are the common meanings, with links to the pattern pages where you can see each one on a calendar.
- Rotation, or pattern
- The fixed sequence of shifts and days off that repeats. "2-2-3" describes the groups: 2 days on, 2 off, 3 on, and so on. See the Pitman schedule for the most common example.
- Cycle
- How many days pass before the pattern starts again. Pitman has a 14-day cycle, DuPont a 28-day cycle, 24/48 a 3-day cycle. The cycle length decides whether your days off fall on the same weekdays each time.
- Crew, shift, team or platoon
- A group that works the same days together, usually named with a letter (A, B, C, D) or a color. Crews on the same pattern start the cycle on different days so that someone is always on duty. Fire departments often say "shift" or "platoon" for a crew.
- Fixed shifts
- A crew always works the same hours, for example always days. The work days still rotate through the week, but the time of day does not change.
- Rotating shifts
- A crew moves between day and night shifts (and on 8-hour schedules, afternoons). Panama, DuPont and the continental schedule rotate.
- Day, swing and night shift
- On 8-hour schedules the day is split into three shifts, often called day (morning), swing (afternoon or evening) and night (overnight, also called graveyard). On 12-hour schedules there are only day and night shifts.
- 24/48
- A 24-hour shift followed by 48 hours off. Three crews cover every day. See the 24/48 schedule; the 48/96 schedule doubles both numbers.
- Kelly day
- An extra day off built into a fire-service rotation to bring average hours down. The Kelly schedule on this site is the common 9-day version with three 24-hour shifts per cycle.
- Compressed workweek
- Working the same hours in fewer, longer days. The 9/80 schedule fits 80 hours into nine days every two weeks; a 4/10 schedule fits 40 hours into four 10-hour days.
- Workweek
- The fixed 7-day period an employer uses to count hours for overtime. It does not have to start on Monday. On a 9/80 schedule the workweek usually starts in the middle of the 8-hour Friday so that both weeks total 40 hours.
- Overtime and 7(k)
- Under the US Fair Labor Standards Act, most hourly workers are owed overtime after 40 hours in a workweek. Section 7(k) lets public fire and law-enforcement agencies count hours over a work period of up to 28 days with a higher threshold. Rules vary by state and contract, so check yours.
- Coverage
- How many people are on duty at a given hour. A 24/7 site on 12-hour shifts needs four crews; on 24-hour shifts it needs three.
- Day 1
- The first day of your crew's cycle. On this site, the start date you enter is day 1. If you don't know it, each pattern page can work it out from where you are in the cycle today.
Not sure which pattern fits you? Read how to choose a rotating shift schedule.
More guides
- How rotating shift schedules workCrews, cycles and the arithmetic of 24/7 coverage.
- Weekends off, schedule by scheduleFull weekends per year for every pattern, for every start weekday.
- Overtime on 12 and 24-hour shiftsThe 40-hour week, section 7(k) and why workweek start days matter.
- How much leave you need for time awayShifts of leave for a 7, 10, 14 or 21-day break on each pattern.
- Sleeping on rotating shiftsPractical habits for nights, switches and 24-hour tours.
- How to choose a rotating shift scheduleEvery pattern side by side, with five questions to ask first.
Last updated: November 2026.